Clearances
Door swings, shower access, WC space, vanity use and cleaning routes.
A premium bathroom is a compact construction project. Layout, structure, drainage, waterproofing, ventilation, electrical safety and finish tolerances all compete for the same small space; Top Builders coordinates them as one design-and-build scope.
Discuss your project
Joists, slab, walls, openings and load capacity.
Water, wastes, ventilation, heating and electrical routes.
Rigid, compatible backgrounds prepared for the selected system.
Continuous tanking, corners, penetrations and wet-zone interfaces.
Tile, stone, microcement or other specified finish with controlled movement joints.
Sanitaryware, screens, joinery, lighting, accessories and commissioning.

The visual calm of a finished bathroom depends on early dimensional control: niches, grout lines, fittings, lighting and joinery share one setting-out plan.
Door swings, shower access, WC space, vanity use and cleaning routes.
Extract route, make-up air, controls and surfaces that can dry after use.
Valves, traps, concealed cisterns and serviceable components remain reachable.
Task, ambient and night lighting coordinated with safe equipment positions.
Substantively updated
A premium bathroom renovation is both an interior project and a compact piece of construction. The layout, pipework, drainage, electrics, heating, ventilation, waterproofing, furniture and finish details must all fit within the same room and be completed in the right order.
Top Builders manages complete bathroom renovations and new ensuite installations in Dublin, coordinating the trades and technical layers behind the finished space as one project.
The scope can run from removal and preparation through concealed services, specialist finishes, fitted furniture and final detailing.
A dated, cramped or poorly ventilated bathroom can be reconsidered rather than simply replaced like for like. The renovation can improve the layout, plumbing, lighting, heating, ventilation and storage before the new finish package is installed.
A new bathroom requires an early feasibility check for water, waste, drainage falls, ventilation and electrical requirements. The bath, shower, WC and vanity positions are then coordinated with doors, circulation, heating, lighting and storage so the room feels planned rather than pieced together.
Premium finishes depend on reliable preparation and correctly sequenced concealed work.
Pipework and drainage are coordinated around the selected shower, bath, basin, WC and other sanitaryware. Changing a layout can affect floor build-up, routes through adjoining rooms and the order of installation.
General, task and feature lighting can serve different parts of the room. Illuminated mirrors, controls, sockets and other electrical items are planned within the bathroom's electrical requirements and the wider layout.
Wet areas need a suitable waterproofing build-up before decorative surfaces are installed. Effective extraction and ventilation help manage humidity and protect the room and its finishes after handover.
Bespoke cabinetry can use the available width and depth more effectively than standard furniture. Floating vanities, integrated storage and custom units can be coordinated with stone countertops, mirrors, sockets, lighting and the plumbing inside the unit.
Underfloor heating can provide a warm floor surface and leave more wall area available, where the existing construction and overall heating strategy make it suitable. Its build-up, controls and compatibility with the chosen finish need to be decided before installation.
A coordinated bathroom service reduces the gaps between demolition, plumbing, electrics, waterproofing, heating, tiling, furniture and decoration. It also gives the homeowner one project sequence instead of a collection of unrelated trade dates.
Bathroom renovation cost depends on the room's condition and size, layout changes, concealed service work, substrate preparation, selected sanitaryware, bespoke furniture and the material and detail specification. Marble, natural stone, large-format tiles, microcement and custom stonework require a scope based on the actual design rather than a generic room price.
Projects involving layout change, older fabric, structural work, demanding waterproofing or ventilation, bespoke detailing, or coordination with a wider renovation are the strongest fit.
Potentially. Drainage falls, joist direction, floor depth, ventilation and access for maintenance determine what is sensible before the layout is fixed.
A compatible waterproofing system is specified and installed as a complete build-up, including corners, penetrations, falls and interfaces. Tile and grout are not treated as the waterproof layer.
Yes, with the floor, walls, ventilation route, retained details and moisture behaviour assessed before heavy finishes and concealed services are added.
The procurement route is agreed in the scope. Critical dimensions, concealed components and lead times must be confirmed before first-fix work, whether supplied through Top Builders or a named client supplier.
Cost depends on the bathroom's size and condition, layout changes, plumbing and electrical work, waterproofing, heating, ventilation, sanitaryware, furniture and finish specification. A tailored quotation follows the room and scope rather than a universal price.
Yes. A complete renovation can include removal, preparation, plumbing, electrics, lighting, ventilation, waterproofing, heating, tiling, fitted furniture, sanitaryware and finishing.
Yes, subject to feasibility. Water supply, waste and drainage routes, ventilation, electrics, floor construction and the effect on adjoining rooms need to be assessed before the new layout is fixed.
These materials can form part of the specification. Their substrate, setting-out, pattern, alignment, cuts, joints, edge details and junctions with sanitaryware and furniture need to be planned before installation.
Yes. Custom vanities and storage can be designed around the room and coordinated with stone countertops, mirrors, lighting, sockets and concealed plumbing.
They can be coordinated within the complete renovation scope, along with the necessary preparation, fittings, lighting, heating, ventilation and finishing responsibilities.
It can be included where the floor construction, proposed finish, controls and wider heating system are suitable. The build-up needs to be resolved before floor levels are fixed.
Bathrooms generate moisture and humidity. Appropriate extraction and ventilation form part of protecting the room, supporting indoor comfort and looking after the completed finishes.
The enquiry form carries this service into your brief. Add the address area, project stage and any photographs or drawings you already have.
Start your brief