Careful construction for homes where every metre matters.

Terraced homes bring particular design and construction constraints: narrow access, shared boundaries, deep plans and sensitive junctions. Those constraints need to shape the build strategy from the beginning.

Discuss your project
Contemporary residential construction illustrating terraced extensions
Scope

One coordinated build, with responsibilities made clear.

  • Access and logistics review
  • Boundary and junction planning
  • Temporary protection
  • Structural alterations
  • New and existing floor integration

Terraced projects should be reviewed for boundary, streetscape, conservation and previous-development considerations as relevant to the property.

The route

A clear path from first conversation to handover.

  1. 01

    Brief

    Tell us what needs to change and what the finished home should make possible.

  2. 02

    Site visit

    We look at access, structure, constraints and the existing fabric before shaping the scope.

  3. 03

    Scope

    The work, assumptions and next decisions are set out clearly before construction begins.

  4. 04

    Build

    A coordinated team delivers the agreed work with practical communication throughout.

  5. 05

    Handover

    We walk the finished work with you and close out the agreed project details.

Quote clarity

What shapes the project investment.

A useful quote reflects the real project conditions and finish decisions. These are the variables we establish before the work is treated as fixed.

  1. 01Rear access and material handling
  2. 02Party-wall and boundary conditions
  3. 03Existing drainage routes
  4. 04Depth of internal renovation
Project approach

The quality is in the decisions between the drawings.

See how structure, daylight, materials and the existing home are considered as one connected build.

Common questions

Before planning terraced extensions.

01Is rear access essential?

No, but restricted access changes logistics, protection and labour. The route for demolition material, concrete, steel and finishes must be planned into the scope.

02Can the side return be included?

Often it can form part of the design, subject to the property, boundaries, drainage and planning position. It is assessed as part of the whole ground-floor strategy.

03How are neighbours considered?

Working hours, access, boundary details, temporary works and communication all need to be managed carefully on close urban sites.

Start with the brief

Planning terraced extensions? Start with a short brief.

A short, button-led form gives us the essentials. Add plans or photos if you have them; you can keep the first message simple.

Request a quote Or call +353 87 459 1068