Rear
Direct garden connection and a new kitchen/living edge.
A house extension should solve more than floor area. Top Builders designs and builds Dublin extensions around planning, structure, daylight, the garden, the existing rooms and the construction route through an occupied neighbourhood.
Discuss your project
Measure garden depth, orientation, neighbours, boundaries, drains, trees and the rooms that must remain useful.
Check prior development and the exact proposal against current requirements before relying on exemption.
Plan access for demolition, concrete, steel, glazing and finishes, particularly on terraced sites.
Coordinate internal openings, floor levels, kitchen, utilities, heating and electrical work with the addition.

The extension earns its value at the threshold back into the original house—not only at the garden façade.
Direct garden connection and a new kitchen/living edge.
Use narrow residual space while managing boundaries and daylight.
Combine rear and side work where the site and planning route support it.
Add rooms at both levels with greater planning, roof and occupation complexity.
Substantively updated
A house extension should improve how the entire home works, not just add square metres. The best route starts with the property, the planning position, structure, daylight, garden connection and the rooms that will lead into the new space.
Top Builders delivers house extensions in Dublin through a coordinated design-and-build process, bringing the new construction and the necessary renovation of the existing house into one clearly defined project.
The right extension type depends on the site, house form, required rooms, planning constraints and the effect on the existing layout.
A rear house extension is often used to create a larger kitchen, dining and living space with a stronger garden connection. A side or side-return extension can use a narrow strip of land to widen the plan, improve circulation or add utility and storage space.
A single-storey or ground-floor extension can transform daily living without adding an upper level. A wraparound scheme combines side and rear space, while a smaller extension can be the better answer where one precise change unlocks the existing rooms.
A two-storey extension can add accommodation on both levels but brings additional planning, structural, roof and service questions. Bungalows, terraces, semi-detached houses and period homes each have different boundaries, access routes, roof forms and old-to-new junctions; a modern design still needs to respond to those conditions.
Before a layout is treated as buildable, the team needs to understand the available footprint, previous additions, site access, boundaries, drainage, ground conditions, existing services and the structure that will connect old and new.
Architectural design, structural engineering and construction information serve different purposes. Responsibilities for drawings, calculations, applications and site decisions should be established early, whether the professionals are appointed through the project or directly by the homeowner.
Some residential extensions may qualify as exempted development, while others require planning permission. The answer is property- and proposal-specific.
Extension size, height, position, remaining private open space, previous development, property status and local constraints can all affect the planning route. Exempted development is conditional, so a proposal should not be assumed exempt from one measurement alone.
The project may also require structural design, building-regulation coordination and other professional inputs regardless of whether a planning application is needed. Current requirements should be confirmed for the particular address before construction is committed.
There is no reliable universal cost per square metre for every extension because equal floor areas can require very different work.
A useful house-extension quotation is based on the design, existing conditions and an agreed level of completion. A rear kitchen extension with a wide structural opening, extensive glazing and major service changes cannot be compared directly with a simpler enclosed addition of the same size.
Start with the additional space, layout problems, budget priorities and timing. Review the house and site to identify the information and professional assessments the project needs.
Test the extension against the existing plan, structure, daylight, garden, access and current planning requirements. Develop the architectural and engineering information needed for the selected route.
Define what is included in the new build, what changes inside the existing home, the intended finish level and the responsibilities for kitchens, glazing, specialist systems and professional inputs.
Sequence site setup, groundworks, structure, envelope, services and the opening into the house. Complete the internal connection and finishes before inspection and handover.
Yes. House extensions are offered through an in-house design-and-build route so feasibility, permissions, structure, services, construction and finishing can be coordinated from the outset.
No, but exempted-development conditions are property-specific. Previous additions, position, height, boundaries and planning status are checked before the project relies on an exemption.
Often. The extension performs better when circulation, kitchen position, storage, services and the rooms left inside the original house are designed as one scope.
Possibly for parts of the programme. Access, structural work, weathering, dust, fire separation and service interruptions determine where occupation is safe and sensible.
Once the project information defines size, structure, envelope, glazing, services, existing-house work, access and finish responsibilities. Early budgets remain conditional until those variables are resolved.
Cost depends on the extension's size and form, site access, ground and drainage conditions, structure, glazing, service changes, work to the existing house and finish specification. A project-specific design and scope are needed before a meaningful quotation can be prepared.
Not every extension requires a planning application, but exempted development is subject to conditions and previous work can affect the position. Confirm the current planning route for your property and exact proposal before committing to construction.
That depends on the site, house type, previous development, proposed height and position, remaining private open space and any property-specific constraints. A designer or planning professional should assess the current rules against the address and proposal.
Projects can include rear, kitchen, side, side-return, single-storey, two-storey, wraparound, ground-floor and smaller extensions, subject to the property, planning position and project fit.
These house types can all be considered, but each brings different questions around access, boundaries, roof form, neighbours, original fabric and the junction between old and new. Feasibility is assessed for the individual property.
The required professional team depends on the project. Extensions commonly need architectural information and project-specific structural design. The scope should identify who is responsible for design, calculations, applications, inspections and construction information.
Yes. Many projects work best when the extension and the rooms leading into it are designed as one scheme, including the structural opening, kitchen, utility space, circulation, services, flooring and decoration.
The enquiry form carries this service into your brief. Add the address area, project stage and any photographs or drawings you already have.
Start your brief